Fourth Report of HLC on Games Venues
Document Type # Document Name Link File Size
(KB)
# of Pages
Main Report 1 Main Report Main Report 3655 363
Annexure
Annexure 2 Annexure Annexure Cover 99 01
  3 Jawahar Lal Nehru Sports Complex  
3.1 Construction of New Fixed Tensile Membrane Roofing over the seating area in Jawaharlal Nehru Stadium (JNS)
3.1A EE note for initial selection of bidders & re-invitation EE note for initial selection of bidders & re-invitation 154 02
3.1B SPCL disqualification & qualification SPCL disqualification & qualification 1,113 02
3.1C SPCL letter for crane hiring charges SPCL letter for crane hiring charges 118 01
3.1D Estimated rate of FLC (on the basis of VSL India) Estimated rate of FLC (on the basis of VSL India) 698 02
3.1E Justification rate calculation of FLC Justification rate calculation of FLC 75 01
3.1F CES letter for justification CES letter for justification 65 01
3.1G Negotiation letter of SPCL Negotiation letter of SPCL 407 03
3.1H Import details of SPCL (2008-2010) Import details of SPCL (2008-2010) 42 14
3.1I TMC invoice (sample) TMC invoice (sample)   120 01
3.1J SPCL letter after issue of tender document SPCL letter after issue of tender document  162 01
3.2 Laying of IAAF-approved Synthetic Athletic Track Surface in various stadia of Delhi for CWG 2010 -- Jawahar Lal Nehru Stadium & Other Venues  
3.2A Copy of  justified cost statement Copy of  justified cost statement 3,249 05
3.2B Statement showing variation in justified cost and DSR Statement showing variation in justified cost and DSR 3,249 01
3.2C Copies of documents evidencing the work executed by M/s Shiv Naresh at Ranchi.  Copies of documents evidencing the work executed by M/s Shiv Naresh at Ranchi.  3,289 05
3.2D Letter dated 25.01.2011 submitted by Shiv Naresh to income tax department  Letter dated 25.01.2011 submitted by Shiv Naresh to income tax department  4,110 06
3.2E Letter dated 12.01.2011 along with copy of ledger account of "purchase import (CWG 2010)" submitted by Shiv Naresh to income tax department  Letter dated 12.01.2011 along with copy of ledger account of "purchase import (CWG 2010)" submitted by Shiv Naresh to income tax department  2,630 06
3.2F Copy of letter submitted by council of IJMCPL before income tax department stating that part of the work was sub-contracted to client (IJMCPL). Copy of letter submitted by council of IJMCPL before income tax department stating that part of the work was sub-contracted to client (IJMCPL). 2,383 04
3.3 Providing & Laying Flat Lawn greens over compatible sub-base in stadia for Lawn Bowls  
3.3A Copy of justification statement approved by CPWD and DDA Copy of justification statement approved by CPWD and DDA 901 02
3.3B Copy of relevant portion in venue brief -JLN lawn bowls made by EKS in november,2006 Copy of relevant portion in venue brief -JLN lawn bowls made by EKS in november,2006 866 01
3.3C Copy of EKS' letter dated 27.7.2007 to Shri ASV Prasad (ADG technical) Copy of EKS' letter dated 27.7.2007 to Shri ASV Prasad (ADG technical) 698 01
3.3D Copy of Shri Suresh Kalmadi, Chairman, OC, letters  dated 12th may, 07 & 11th may,2005 from to DG, SAI Copy of Shri Suresh Kalmadi, Chairman, OC, letters  dated 12th may, 07 & 11th may,2005 from to DG, SAI 935 02
3.3E Copy of relevant document in return venue brief -training venue at DPS school lawn bowls made by SAI in september,2008 Copy of relevant document in return venue brief -training venue at DPS school lawn bowls made by SAI in september,2008 665 01
3.3F Copy from customs, Tughlakabad of jubilee and import invoices Copy from customs, Tughlakabad of jubilee and import invoices 3662 05
3.3G Copy of quotation mail received from sports technology international (Asia) ltd dated 25th Aug, 2009. Copy of quotation mail received from sports technology international (Asia) ltd dated 25th Aug, 2009. 45 01
3.3H Copy of quotation mail received from dales sports dated 22nd august, 2009 and Umang Carriers Copy of quotation mail received from dales sports dated 22nd august, 2009 and Umang Carriers 2,018 01
3.3I Jubilee association with dales & STI Jubilee association with dales & STI 3,739 03
3.3J Copy of quotation mail from Umang carrier dared 24th august, 2009 Copy of quotation mail from Umang carrier dared 24th august, 2009 98 01
3.4 Weightlifting Auditorium  
3.4A Press notice (PN) for PQ did not contain anything specific as to experience in roofing Press notice (PN) for PQ did not contain anything specific as to experience in roofing 2,108 01
3.4B Extract from nit of agreement Extract from nit of agreement 404 01
3.4C BOQ material for roofing BOQ material for roofing 3,301 01
3.4D NCCL's letter to CPWD stating that its associates for Zincalume roofing either refused or shown inability to do the job because of the shape of the structure. NCCL's letter to CPWD stating that its associates for Zincalume roofing either refused or shown inability to do the job because of the shape of the structure. 317 03
3.4E NCCL's letter of recommendation for CIIL (Kalzip System) for c/o roofing of weight-lifting auditorium. NCCL's letter of recommendation for CIIL (Kalzip System) for c/o roofing of weight-lifting auditorium. 1,633 01
3.4F CPWD's in-principal approval of substituted item  Kalzip system' for c/o roofing of Weight-Lifting auditorium CPWD's in-principal approval of substituted item  Kalzip system' for c/o roofing of Weight-Lifting auditorium         2,117 01
3.4G Payment of INR 4.40 crores made to NCCL as per last RA bill for Kalzip roofing of weight-lifting auditorium Payment of INR 4.40 crores made to NCCL as per last RA bill for Kalzip roofing of weight-lifting auditorium 981 01
3.4H CPWD confirmed that basement parking was not used during games as Delhi Police did not give permission for the same due to security concerns. CPWD confirmed that basement parking was not used during games as Delhi Police did not give permission for the same due to security concerns. 5,694 01
3.4I MCD's 'fit to occupy' certificate for wl auditorium MCD's 'fit to occupy' certificate for wl auditorium 1,977 01
3.4J CPWD's letter to NCCL notifying about the re-work required CPWD's letter to NCCL notifying about the re-work required 101 04
3.4K CPWD rejected NCCL's claim of 30th ra bill due to errors in calculation. CPWD rejected NCCL's claim of 30th ra bill due to errors in calculation. 480 01
3.4L Extract from CPWD noting - justification statement of weight-lifting auditorium agreement Extract from CPWD noting - justification statement of weight-lifting auditorium agreement 363 01
3.5 DG Sets for SAI Stadia  
3.5A Budgetary quote from M/s TEIL Budgetary quote from M/s TEIL 573 03
3.5B Budgetary quote from M/s SSD Electro-Mech Pvt Ltd. Budgetary quote from M/s SSD Electro-Mech Pvt Ltd. 290 04
3.6 Purchase of Uninterrupted Power Systems (UPS) for CWG Venues  
3.6A Mom of meeting dt 08.05.2009 Mom of meeting dt 08.05.2009 221 02
3.6B Value of contracts awarded to power house and Labotek Value of contracts awarded to power house and Labotek 897 02
3.6C Rate quoted to different stadia Rate quoted to different stadia 217 06
3.6D Rate quoted by power house for supplying to NICSI Rate quoted by power house for supplying to NICSI 275 02
3.6E Cost of ups to PNB Cost of ups to PNB 112 02
3.6F NICSI's contract dt 18.08.2010 NICSI's contract dt 18.08.2010 82 06
3.6G Quotation of nice power system (agent of Emerson) Quotation of nice power system (agent of Emerson) 103 04
3.6H Quotation obtained from market for APC Quotation obtained from market for APC 117 04
3.6I Information received from Income Tax Department Information received from Income Tax Department 746 02
4 Major Dhyan Chand National Stadium Annexure 4A - 4I 111 16
4A CPWD central works board minutes held on Sept 30, 2009 and  Oct 7/8, 2009  
4B Jubilee Sports Technology (I) Pvt Ltd quotation dated march 19 2009
4C List of works executed by jubilee 
4D Sports technology international (Asia) ltd, Australia,  quotation dated Sept 2, 2009
4E Invoice no: p4053 / au dated Jan 13, 2010 of sports technology international (Asia) ltd, Australia,  on jubilee sports at USD 20 per sqm for poligras olympia
4F Marine insurance policy
4G Extract from r a bill of unity for amount claimed from CPWD
4H Extract from r a bill of unity for amount claimed from DDA
4I Jubilee records from customs department
5 Dr. Shyama Prasad Mukherjee Swimming Pool Complex Annexure 5A - 5J 118 17
5A Corrigendum 1  
5B PQ criteria
5C NCCL experience in RCC
5D ACIL proposal for extra item of KALZIP roofing
5E Extra item proposal for KALZIP roofing
5F Extra item proposal of service building
5G Proposal for extra item of stainless steel nuts, bolts and plates
5H Letter for non-admissibility of extra item of stainless steel plates, bolts, nuts and washer
5I ACIL's reply to CPWD on non-admissibility of item of stainless steel plates, nuts and bolts 
5J Proposal for approval of 13 extra item
6 Dr. Karni Singh Shooting Range
6A Copy of CES estimate of Rs. 24.22 crore for augmentation and renovation of KSSR. Copy of CES estimate of Rs. 24.22 crore for augmentation and renovation of KSSR. 108 02
6B Increase in justified cost  Increase in justified cost  113 04
7 Indira Gandhi Sports Complex - Cycling Velodrome  
7A Minutes of the meeting held on 18.06.2008 Minutes of the meeting held on 18.06.2008 145 04
7B Letter no. F70-9/2007-cg dated 19.09.2008 from govt. Of India MoYAS to DG, SAI Letter no. F70-9/2007-cg dated 19.09.2008 from govt. Of India MoYAS to DG, SAI   02
7C Rough budgetary cost estimate as given by Schermann, Germany Rough budgetary cost estimate as given by Schermann, Germany 1,823 08
7D Justification statement Justification statement 65 02
7E Detail of imports and customs duty paid Detail of imports and customs duty paid 252 05
9 Shivaji Stadium Annexure 9A - 9C 51 18
9A Overview of Shivaji Stadium  
9B Discussion on Shivaji Stadium in Empowered Committee Meeting
9C List of Documents reviewed by HLC
10 Talkatora Stadium Annexure 10A - 10G 260 17
10A Overview of Talkatora Indoor Stadium - New Block  
10B Overview of Talkatora Indoor Stadium - Additional / Alteration works
10C Overview of Talkatora Indoor Stadium - Maple Wood flooring
10D Extra items over and above bill of material
10E Substituted items in the original bill of material
10F Rate comparison of Concrete M-30 Grade
10G Discussion on Talkatora Indoor Stadium in Empowered Committee Meeting
14 Delhi University Stadium
14A Cost of various Training and Competition Venues Cost of various Training and Competition Venues 3,032 01
14B Details of award of work for University Stadium and training venues Details of award of work for University Stadium and training venues 480 03
Relevant Documents
Relevant Documents 3 Relevant Documents Relevant Documents Cover 79 01
  2 Venue Briefs  
2A Letter from M/S EKS forwarding proposal Letter from M/S EKS forwarding proposal (RD2A1toA7) 2,609 28
2B Agenda Notes for Meeting of Executive Board Agenda Notes for Meeting of Executive Board (RD2B1toB2) 1,091 08
3 Jawahar Lal Nehru Sports Complex  
3.1 Construction of New Fixed Tensile Membrane Roofing over the seating area in Jawaharlal Nehru Stadium (JNS)
3.1A Corrigendum issued in Pre bid meeting Corrigendum issued in Pre bid meeting 216 02
3.1B Memo forwarding tender to CWB Memo forwarding tender to CWB 1,002 03
3.1C AA & TS AA & TS 1,309 05
3.1D Revision in tendered cost Revision in tendered cost 2,986 01
3.1E CWB Minutes & Award letter CWB Minutes & Award letter 669 04
3.1F Date of start & completion Date of start & completion 1,275 06
3.1G Payment details Payment details 1,262 06
3.1H SAIL rates for steel & rate analysis SAIL rates for steel & rate analysis 808 05
3.1I SPCL's quote for cable SPCL's quote for cable 308 01
3.1J Payment made for Fully locked cables Payment made for Fully locked cables 440 01
3.1K Justification of compressed time schedule Justification of compressed time schedule 200 02
3.1L Negotiation details Negotiation details 1,949 11
3.1M Estimated cost & SPCL's quote for membrane Estimated cost & SPCL's quote for membrane 993 02
3.1N CPWD rate analysis for membrane CPWD rate analysis for membrane 149 01
3.1O Cost of imported items- calculations Cost of imported items- calculations 443 04
3.2 Laying of IAAF-approved Synthetic Athletic Track Surface in various stadia of Delhi for CWG 2010 -- Jawahar Lal Nehru Stadium & Other Venues  
3.2A Copy of Letter dated 05.05.2009 Copy of Letter dated 05.05.2009 327 03
3.2B Copy of Letter dated 11.05.2009 Copy of Letter dated 11.05.2009 1,934 01
3.2C Copy of Technical Sanction Copy of Technical Sanction 2,622 04
3.2D Copy of Minutes of 13th & 14th meeting held on 30.09.2009 Copy of Minutes of 13th & 14th meeting held on 30.09.2009 2,301 03
3.2E Relevant extracts from contractor's price bid relating to supply and installation of athletic track. Relevant extracts from contractor's price bid relating to supply and installation of athletic track. 1,815 02
3.2F Copy of Cement Register for FOP Project at JLN Stadium Copy of Cement Register for FOP Project at JLN Stadium 2,983 04
3.2G Relevant Extracts from 5th R.A. Bill evidencing cement consumption on FOP Project at JLN Stadium Relevant Extracts from 5th R.A. Bill evidencing cement consumption on FOP Project at JLN Stadium 2,649 02
3.2H Calculation of Cement Consumption  on FOP Project as per DSR 2007 Calculation of Cement Consumption  on FOP Project as per DSR 2007 387 01
3.3 Providing & Laying Flat Lawn greens over compatible sub-base in stadia for Lawn Bowls  
3.3A Copy of Raj Bengani's Mail  dated 9th May,2007 to Shri Suresh Kalmadi and Copy of Note given by D.R. Saini, Vice Principal, DPS for justification of Lawn Bowls Training Venue Copy of Raj Bengani's Mail  dated 9th May,2007 to Shri Suresh Kalmadi and Copy of Note given by D.R. Saini, Vice Principal, DPS for justification of Lawn Bowls Training Venue 619 03
3.3B Copy of total expenditure booked for the lawn bowl project by Jubilee from Tally accounts Copy of total expenditure booked for the lawn bowl project by Jubilee from Tally accounts 1,226 03
3.3C Copy of letter from Assistant Engineer,CWGD-III,CPWD Copy of letter from Assistant Engineer,CWGD-III,CPWD 562 01
3.3D Copy of quotation for repair of lawn bowl, invoice  of import of greens for repair Copy of quotation for repair of lawn bowl, invoice  of import of greens for repair 1,071 07
3.4 Weightlifting Auditorium   
3.4A CES appointment & scope of work CES appointment & scope of work 314 02
3.4B Press notice and eligibility criteria Press notice and eligibility criteria 422 01
3.4C Estimated Cost as per NIT Estimated Cost as per NIT 290 02
3.4D Pre qualification of 8 bidders, evaluation, Tenders sold Pre qualification of 8 bidders, evaluation, Tenders sold 267 04
3.4E Financial bid Financial bid 266 01
3.4F Non availability of justification statement of E&M works Non availability of justification statement of E&M works 93 01
3.4G Date of completion Date of completion 265 02
3.4H Payment made till date Payment made till date 673 07
3.4I NCCL's proposal for substitution of zincalume steel (Zincalume) by Aluminium Standing seam profiling system (KALZIP) of CIIL NCCL's proposal for substitution of zincalume steel (Zincalume) by Aluminium Standing seam profiling system (KALZIP) of CIIL 294 02
3.4J Basement car parking requirement as per Venue Brief (EKS) Basement car parking requirement as per Venue Brief (EKS) 648 05
3.4K Basement car parking requirement as per Return Facility Brief (CES) Basement car parking requirement as per Return Facility Brief (CES) 364 02
3.4L Amount withheld for not achieving milestones Amount withheld for not achieving milestones 195 01
3.4M Difference in justified amount and DSR Rates Difference in justified amount and DSR Rates 624 01
3.4N Corrigendum issued by CPWD to the pre-qualified agencies notifying modification of contractor's profit and overheads from 10% to 15%. Corrigendum issued by CPWD to the pre-qualified agencies notifying modification of contractor's profit and overheads from 10% to 15%. 289 01
3.4O CPWD considered contractor's profit and overheads as 15% instead of 10% CPWD considered contractor's profit and overheads as 15% instead of 10% 178 01
4 Major Dhyan Chand National Stadium      
4A Press notice Major Dhyan Chand National Stadium RD 4A to RD 4K 2,167 18
4B OC's letter dated 5th nov 2008 - shortlisting of brands
4C OC's letter dated 9th june 2009 - final brands shortlisted
4D MoYaS's letter on schedule
4E NIT
4F PQ noting - 1st lowest bidder unity
4G Unity's revised offer after negotiation
4H Award Letter M/S Unity
4I Unity negotiated rates
4J Jubilee's invoice on Unity (wct - sales - unity - hockey)
4K Jubilee's invoice on Unity (paid till date)
5 Dr. Shyama Prasad Mukherjee Swimming Pool Complex  
5A CES - Letter of Award Dr. Shyama Prasad Mukherjee Swimming Pool Complex RD 5A to RD 5C 672 03
5B Notice Inviting Tender (NIT)
5C Pre-qualification (PQ) Evaluation - NCCL
6 Dr. Karni Singh Shooting Range  
6A Copy of Award Letter of Consultancy Contract of KSSR to CES. Copy of Award Letter of Consultancy Contract of KSSR to CES. 844 02
6B Extra Item Statements of Consultancy Contracts of KSSR to CES Extra Item Statements of Consultancy Contracts of KSSR to CES 1004 02
6C EFC approval of Rs. 1342 crore which included Rs. 80 crore for KSSR EFC approval of Rs. 1342 crore which included Rs. 80 crore for KSSR 457 01
6D Copy of govt. sanction of Rs. 1000 crore which included Rs. 16 crore for KSSR Copy of govt. sanction of Rs. 1000 crore which included Rs. 16 crore for KSSR 1,303 03
6E Copy of Detailed Estimate of Rs. 59.24 crore. Copy of Detailed Estimate of Rs. 59.24 crore. 896 05
6F Copy of Award Letter of Construction Contract of KSSR to Era Infra. Copy of Award Letter of Construction Contract of KSSR to Era Infra. 1,654 01
7 Indira Gandhi Sports Complex - Cycling Velodrome  
7A Letter No. 70-9/2007-CG dated 23.10.2008 from GOI, MoYAS to SE, CWG Letter No. 70-9/2007-CG dated 23.10.2008 from GOI, MoYAS to SE, CWG 1,803 04
7B Estimate and Technical Sanction Estimate and Technical Sanction 1,356 05
7C Notes on Selection of Brands / Agencies for Surfaces Notes on Selection of Brands / Agencies for Surfaces 1,088 03
7D Notes regarding approval of tender. Notes regarding approval of tender. 6,897 24
7E Clause 8(i) of the contract agreement Clause 8(i) of the contract agreement 540 01
7F Letter No. 20 (Misc)/CWGD-VIII/2010-11/AM/720, dated 09.02.2011 from EE, CWGD-VIII, CPWD Letter No. 20 (Misc)/CWGD-VIII/2010-11/AM/720, dated 09.02.2011 from EE, CWGD-VIII, CPWD 437 02
7G Certificate dated 16.08.2010 from M/s Batra & Sharma Associates, Chartered Accountants Certificate dated 16.08.2010 from M/s Batra & Sharma Associates, Chartered Accountants 301 01
9 Shivaji Stadium  
9A Council's Decision on upgradation of Stadia Council's Decision on upgradation of Stadia 221 03
9B OC's letter dated 23rd Dec 2005 OC's letter dated 23rd Dec 2005 196 03
9C A/A & E/S Approval by Council A/A & E/S Approval by Council 429 06
9D File noting on appointment of consultant File noting on appointment of consultant 1,727 38
9E Agreement between NDMC and Consultant Agreement between NDMC and Consultant 1,082 22
9F Eligibility Criteria as per NIT Eligibility Criteria as per NIT 270 03
9G Declaration by China Railway downloaded from ROC website Declaration by China Railway downloaded from ROC website 544 15
9H M/s China Railway intimating NDMC that M/s Simplex would procure items for them M/s China Railway intimating NDMC that M/s Simplex would procure items for them 148 01
9I Observations by Finance Department of NDMC on Contractor's appointment Observations by Finance Department of NDMC on Contractor's appointment 580 10
9J M/s China Railway's Registration Certificate in India dated 15th April 2008 M/s China Railway's Registration Certificate in India dated 15th April 2008 181 01
9K Letter from M/s China Railway to RBI for opening of office in Delhi Letter from M/s China Railway to RBI for opening of office in Delhi 321 03
9L Screen shots from the website of M/s APR Construction Ltd. Screen shots from the website of M/s APR Construction Ltd. 571 03
9M Auditor's report and Balance Sheet of M/s China Railway  Auditor's report and Balance Sheet of M/s China Railway  680 07
9N Service Tax exemption certificate issued to M/s Simplex Service Tax exemption certificate issued to M/s Simplex 504 07
9O FAX received by HLC with TDS details of M/s Simplex FAX received by HLC with TDS details of M/s Simplex 307 02
9P M/s China Railway authorizing an employee of M/s Simplex as their authorized representative in India M/s China Railway authorizing an employee of M/s Simplex as their authorized representative in India 410 05
9P1 Copy of Work Order - Simplex awarding contract to M/s Reckon for Shivaji Stadium Copy of Work Order - Simplex awarding contract to M/s Reckon for Shivaji Stadium 187 02
9Q File not on approval of Chairman, NDMC for procuring chairs for stadium File not on approval of Chairman, NDMC for procuring chairs for stadium 139 01
9R Letter from M/s China Railway dated 29th Oct 2010 requesting for substituting the chair model, while tax invoice show that the chairs were procured in Mar 2010 Letter from M/s China Railway dated 29th Oct 2010 requesting for substituting the chair model, while tax invoice show that the chairs were procured in Mar 2010 729 10
9S Test reports of Chair Test reports of Chair (RD9S1toS2) 516 06
9T Sample Letters showing delays in project execution that NDMC was aware of Sample Letters showing delays in project execution that NDMC was aware of 448 10
9U Two versions of the same minutes of the meeting retrieved from computer Two versions of the same minutes of the meeting retrieved from computer 168 02
9V Manipulation of Justification Cost Manipulation of Justification Cost 187 02
9W Copy of 18th Running Account Bill Copy of 18th Running Account Bill 1,297 24
9X Response given to HLC by NDMC on Stadia projects in February 2011 Response given to HLC by NDMC on Stadia projects in February 2011 805 08
10 Talkatora Stadium  
10A File noting showing Chairman's multiple approvals in procuring Maple Wood flooring File noting showing Chairman's multiple approvals in procuring Maple Wood flooring 1,085 24
10B Re-tendering for Maple Wood Flooring Re-tendering for Maple Wood Flooring 153 01
10C Note mentioning justification statement not required for Maple Wood flooring Note mentioning justification statement not required for Maple Wood flooring 162 01
10D Justification statements for new block Justification statements for new block 2,099 18
10E Justification statements for additional / alteration work Justification statements for additional / alteration work 1,736 26
10F CTE's Report CTE's Report 886 19
10G Sample letters on project delay Sample letters on project delay 572 13
10H Mobilization advance adjusted against Bank Guarantee Mobilization advance adjusted against Bank Guarantee 417 06
14 Delhi University Stadium  
14A Details of Estimates prepared by EIL for DU, Stadiums Details of Estimates prepared by EIL for DU, Stadiums (RD14 A1 to A3) 834 09
14B Correspondence between DU, MOYAS, EFC on legacy use of venues Correspondence between DU, MOYAS, EFC on legacy use of venues 517 02
14C Copy of MOU between MOYAS and DU. Letter by DU to other colleges for entering into MOU Copy of MOU between MOYAS and DU. Letter by DU to other colleges for entering into MOU (RD14 C1 to C4) 1,057 12
14D Extract from Venue use agreement between OC and DU for use period Extract from Venue use agreement between OC and DU for use period (RD14 D to D2) 807 08
14E Correspondence for delay in handover of venues to OC (Venues not used during games) Correspondence for delay in handover of venues to OC (Venues not used during games) (RD14 E11 to 23) 1,456 11
14F Correspondences on wasteful expenditure, due to changes in specifications Correspondences on wasteful expenditure, due to changes in specifications (RD14 FA1 to FB5) 2,836 27
14G Finance Officer note for appointment of EIL for deposit works Finance Officer note for appointment of EIL for deposit works (RD14 G1 to G2) 768 05
14H Internal email note from EIL, confirming the profit on fees from DU Internal email note from EIL, confirming the profit on fees from DU 304 02
14I Email and internal note for extension of Bid for PQ1 & PQ2 Email and internal note for extension of Bid for PQ1 & PQ2 332 02
14J Documents for change in pre-qualification criteria's Documents for change in pre-qualification criteria's (RD14 J1 to J5) 1,683 15
14K Documents for change in bidding strategy and award recommendation Documents for change in bidding strategy and award recommendation (RD14 K1 to K2) 731 08
14L Documents for inflated justification of rates for tender awarded for PQ1 & PQ2 Documents for inflated justification of rates for tender awarded for PQ1 & PQ2 (RD14 L1 to L4) 1,297 11
14M Correspondence on delay in receipt of funds Correspondence on delay in receipt of funds (RD14 M1 to M3) 847 06
14N Documents for stringent eligibility criteria for award of contract of High mast lighting Documents for stringent eligibility criteria for award of contract of High mast lighting (RD14 N1 to N5) 1,001 13
14O Documents for price bid and recommendation of award of contract to M/S Philips Documents for price bid and recommendation of award of contract to M/S Philips (RD14 O1 to O3) 769 08
14P Correspondence for award of contract for laying Athletics Track Correspondence for award of contract for laying Athletics Track (RD14 P1 to P2) 608 07
14Q Correspondence for extension of bid due date and other anomalies Correspondence for extension of bid due date and other anomalies (RD14 Q1 to Q2) 661 08
14R Correspondence for decision to annul the 1st tender Correspondence for decision to annul the 1st tender (RD14R A1 to B4) 2,587 22
14S Correspondence for re-issue of tender and estimates Correspondence for re-issue of tender and estimates (RD14 S1 to S3) 1,143 12
14T Correspondence of identification of vendors and initial for Trees Transplantation work Correspondence of identification of vendors and initial for Trees Transplantation work 405 03
14U Correspondence on extension of bidding due date and change of bidding strategy for Trees Transplantation contract Correspondence on extension of bidding due date and change of bidding strategy for Trees Transplantation contract (RD14 U1 to U3) 1,011 10
14V Correspondence on technical bid analysis and recommendation of award of work Correspondence on technical bid analysis and recommendation of award of work (RD14 V1 to V3) 830 09
14W Correspondence for non performance of contract by Rakesh Singh and work assigned to M/S NCCL Correspondence for non performance of contract by Rakesh Singh and work assigned to M/S NCCL (RD14 W1 to W3) 606 07